Richmond Project – Bathroom
Description of the mandate
In this semi-basement apartment located in Montreal , our mandate was to carry out the complete renovation of the bathroom , most of which had already been demolished before our intervention.
The project included a complete reconfiguration of the sanitary fixtures , modification of the plumbing under the concrete slab, preparation and leveling of the floor, reconstruction of the surfaces, as well as a complete modernization of the electricity, ceramics and various finishing elements.
The objective was to transform the old bathroom into a modern, bright and functional space, including a new bath, underfloor heating and completely renewed fixtures.
Technical challenges
Plumbing modifications within the concrete slab
The new configuration required the relocation of the bath, toilet and sink , as well as some adjustments to bring the facilities up to standard.
Since the bathroom is located in a semi-basement, part of the concrete slab had to be opened up to allow for the relocation of the plumbing pipes.
Once the modifications were completed, the slab was closed and repaired before a self-leveling compound was poured , providing a suitable surface for the following steps.
Integration of the new facilities
The renovation also required coordinating several new installations in a relatively compact space:
Electric underfloor heating.
four recessed lights with dimmer.
New fan with timer.
New sockets and new switches.
New plumbing and taps.
integration of a wall niche in the bathing area.
Particular attention was also paid to the connections between the new surfaces and the existing sections that were retained.
Solutions implemented
Preparation and reconstruction
Repair of the concrete slab after plumbing modifications.
Pouring a self-levelling compound to prepare the new floor.
Sealing open sections with gypsum.
Repair of existing surfaces.
Plaster jointing , sanding, priming and corrections.
Complete painting of the bathroom.
Installation of baseboards and adjustment of the door and the new threshold.
Bath, waterproofing and ceramics
Installation of a new bathtub.
Installation of new taps with rain shower and hand shower.
Creation of a wall niche.
Installation of a Schluter KERDI sealing system.
Installation of 24" x 24" ceramic tiles on the floor.
Installation of ceramic tiles on the three walls surrounding the bath.
The ceramic tiles extend across the entire wall behind the vanity.
Electricity and heated floor
Installation of an electric underfloor heating system with thermostat.
Installation of four recessed spotlights.
Added a dimmer switch for the lighting.
Replacement of sockets and switches.
Installation of a new bathroom fan with timer , connected to the existing duct.
Appliances and finish
Installation of a new vanity unit with sink.
Installation of a new toilet.
Installation of the mirror and accessories.
Adjusting the various finishes to complete the set.
Project duration
Approximately 5 weeks .
Final result
This complete bathroom renovation transformed a semi-basement space into a modern, bright, and fully functional room.
The new configuration, the heated floor , the large format ceramic tiles, the integrated niche and the new electrical and sanitary installations bring more comfort while completely renewing the appearance of the room.
A big thank you to TD Électrique for their excellent work on the electrical installations, and to XL Pro for their expertise in the ceramic and heated floor installation.
Their professionalism and the quality of their work contributed to the success of this beautiful renovation.